CLARK LAKE DAM REPAIR – LAKE LEVELS

As of 9.26.24, the water level at the dam is 9.05. Current DNR range for May 15-Dec 1 is 8.5-9.0.  At 9.0, the water stops flowing over the spillway.  There is a hole in the concrete of the spillway and weakened support for the horizontal fish grates attached to the spillway.  Repair/revision is scheduled to be done around October 15.  In order to accomplish this correctly and safely, the water level will be slowly lowered to approximately 8.5-8.7 by October 15.  
 
The West Boat Ramp dock is scheduled to be removed Oct 24-25. Please consider these two dates as you plan for removing your boat this fall.  
 
Any questions, contact Gwenn Graboyes at (414) 315-4546 or [email protected] .